|
20100110
|
UNIT
|
TREE REMOVAL (6 TO 15 UNITS DIAMETER)
|
Base items
|
269.000
|
|
|
20100210
|
UNIT
|
TREE REMOVAL (OVER 15 UNITS DIAMETER)
|
Base items
|
486.000
|
|
|
20201200
|
CU YD
|
REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL
|
Base items
|
52.000
|
|
|
20400800
|
CU YD
|
FURNISHED EXCAVATION
|
Base items
|
126.000
|
|
|
21001000
|
SQ YD
|
GEOTECHNICAL FABRIC FOR GROUND STABILIZATION
|
Base items
|
306.000
|
|
|
25000100
|
ACRE
|
SEEDING, CLASS 1
|
Base items
|
0.100
|
|
|
25000300
|
ACRE
|
SEEDING, CLASS 3
|
Base items
|
0.100
|
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
18.000
|
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
18.000
|
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
18.000
|
|
|
25100630
|
SQ YD
|
EROSION CONTROL BLANKET
|
Base items
|
50.000
|
|
|
25200110
|
SQ YD
|
SODDING, SALT TOLERANT
|
Base items
|
3,483.000
|
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
3,549.000
|
|
|
28000510
|
EACH
|
INLET FILTERS
|
Base items
|
8.000
|
|
|
30300001
|
CU YD
|
AGGREGATE SUBGRADE IMPROVEMENT
|
Base items
|
100.000
|
|
|
35100500
|
SQ YD
|
AGGREGATE BASE COURSE, TYPE A 6"
|
Base items
|
2,099.000
|
|
|
40201000
|
TON
|
AGGREGATE FOR TEMPORARY ACCESS
|
Base items
|
75.000
|
|
|
42400300
|
SQ FT
|
PORTLAND CEMENT CONCRETE SIDEWALK 6 INCH
|
Base items
|
15,940.000
|
|
|
42400800
|
SQ FT
|
DETECTABLE WARNINGS
|
Base items
|
129.000
|
|
|
44000100
|
SQ YD
|
PAVEMENT REMOVAL
|
Base items
|
151.000
|
|
|
44000600
|
SQ FT
|
SIDEWALK REMOVAL
|
Base items
|
2,367.000
|
|
|
50200100
|
CU YD
|
STRUCTURE EXCAVATION
|
Base items
|
720.300
|
|
|
50300225
|
CU YD
|
CONCRETE STRUCTURES
|
Base items
|
333.000
|
|
|
50300285
|
SQ FT
|
FORM LINER TEXTURED SURFACE
|
Base items
|
4,154.000
|
|
|
50500505
|
EACH
|
STUD SHEAR CONNECTORS
|
Base items
|
2,204.000
|
|
|
50800205
|
POUND
|
REINFORCEMENT BARS, EPOXY COATED
|
Base items
|
35,932.000
|
|
|
51500100
|
EACH
|
NAME PLATES
|
Base items
|
5.000
|
|
|
52200100
|
FOOT
|
FURNISHING SOLDIER PILES (HP SECTION)
|
Base items
|
1,931.000
|
|
|
52200105
|
FOOT
|
FURNISHING SOLDIER PILES (W SECTION)
|
Base items
|
2,221.000
|
|
|
52200200
|
CU FT
|
DRILLING AND SETTING SOLDIER PILES (IN SOIL)
|
Base items
|
20,022.000
|
|
|
52200250
|
SQ FT
|
UNTREATED TIMBER LAGGING
|
Base items
|
6,783.000
|
|
|
56300300
|
FOOT
|
ADJUSTING WATER SERVICE LINES
|
Base items
|
96.000
|
|
|
59100100
|
SQ YD
|
GEOCOMPOSITE WALL DRAIN
|
Base items
|
744.000
|
|
|
60146304
|
FOOT
|
PIPE UNDERDRAINS FOR STRUCTURES 4"
|
Base items
|
1,263.000
|
|
|
60255500
|
EACH
|
MANHOLES TO BE ADJUSTED
|
Base items
|
6.000
|
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
|
70103815
|
CAL DA
|
TRAFFIC CONTROL SURVEILLANCE
|
Base items
|
64.000
|
|
|
72000100
|
SQ FT
|
SIGN PANEL - TYPE 1
|
Base items
|
17.500
|
|
|
72400310
|
SQ FT
|
REMOVE SIGN PANEL - TYPE 1
|
Base items
|
6.250
|
|
|
72900100
|
FOOT
|
METAL POST - TYPE A
|
Base items
|
58.000
|
|
|
78001110
|
FOOT
|
PAINT PAVEMENT MARKING - LINE 4"
|
Base items
|
477.000
|
|
|
78001130
|
FOOT
|
PAINT PAVEMENT MARKING - LINE 6"
|
Base items
|
60.000
|
|
|
78001180
|
FOOT
|
PAINT PAVEMENT MARKING - LINE 24"
|
Base items
|
41.000
|
|
|
LR420129
|
SQ YD
|
PORTLAND CEMENT CONCRETE PAVEMENT 8" (SPECIAL) WITH INTEGRAL CURB
|
Base items
|
151.000
|
|
|
X0326806
|
L SUM
|
WASHOUT BASIN
|
Base items
|
1.000
|
|
|
X2010106
|
UNIT
|
TREE REMOVAL (UNDER 6 UNITS DIAMETER)
|
Base items
|
211.000
|
|
|
X2020410
|
CU YD
|
EARTH EXCAVATION (SPECIAL)
|
Base items
|
2,355.000
|
|
|
X5220098
|
FOOT
|
TIMBER RETAINING WALL REMOVAL
|
Base items
|
67.000
|
|
|
X5630213
|
EACH
|
ADJUSTING SANITARY SEWER SERVICE LINE
|
Base items
|
6.000
|
|
|
X6640525
|
FOOT
|
CHAIN LINK FENCE, 4' ATTACHED TO STRUCTURE
|
Base items
|
1,220.000
|
|
|
X7010216
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
|
Base items
|
1.000
|
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
|
Z0049799
|
EACH
|
PROTECTING OR RESETTING SURVEY MARKERS
|
Base items
|
6.000
|
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
1,000.000
|
$0.80
|
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
1,000.000
|
$15.00
|
|
Z0076870
|
EACH
|
UNDERDRAIN CONNECTION TO STRUCTURE
|
Base items
|
6.000
|
|