Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
5 | 8 | 17.00 | 0.00 | N/A |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
40 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20100500 | ACRE | TREE REMOVAL, ACRES | Base items | 0.500 | |||
20200100 | CU YD | EARTH EXCAVATION | Base items | 115.000 | |||
20400800 | CU YD | FURNISHED EXCAVATION | Base items | 2,180.000 | |||
20800150 | CU YD | TRENCH BACKFILL | Base items | 37.000 | |||
21001000 | SQ YD | GEOTECHNICAL FABRIC FOR GROUND STABILIZATION | Base items | 2,055.000 | |||
21101505 | CU YD | TOPSOIL EXCAVATION AND PLACEMENT | Base items | 1,345.000 | |||
25000210 | ACRE | SEEDING, CLASS 2A | Base items | 0.500 | |||
25000400 | POUND | NITROGEN FERTILIZER NUTRIENT | Base items | 46.000 | |||
25000500 | POUND | PHOSPHORUS FERTILIZER NUTRIENT | Base items | 46.000 | |||
25000600 | POUND | POTASSIUM FERTILIZER NUTRIENT | Base items | 46.000 | |||
25000750 | ACRE | MOWING | Base items | 2.000 | |||
25100115 | ACRE | MULCH, METHOD 2 | Base items | 0.160 | |||
25100630 | SQ YD | EROSION CONTROL BLANKET | Base items | 1,667.000 | |||
28000250 | POUND | TEMPORARY EROSION CONTROL SEEDING | Base items | 51.000 | |||
28000305 | FOOT | TEMPORARY DITCH CHECKS | Base items | 30.000 | |||
28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 774.000 | |||
28000500 | EACH | INLET AND PIPE PROTECTION | Base items | 2.000 | |||
28100107 | SQ YD | STONE RIPRAP, CLASS A4 | Base items | 11.000 | |||
28200200 | SQ YD | FILTER FABRIC | Base items | 11.000 | |||
30300011 | TON | AGGREGATE SUBGRADE IMPROVEMENT | Base items | 1,405.000 | |||
40600275 | POUND | BITUMINOUS MATERIALS (PRIME COAT) | Base items | 1,776.000 | |||
40603080 | TON | HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N50 | Base items | 424.000 | |||
40604060 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50 | Base items | 212.000 | |||
44000100 | SQ YD | PAVEMENT REMOVAL | Base items | 779.000 | |||
54213660 | EACH | PRECAST REINFORCED CONCRETE FLARED END SECTIONS 15" | Base items | 2.000 | |||
54213669 | EACH | PRECAST REINFORCED CONCRETE FLARED END SECTIONS 24" | Base items | 2.000 | |||
542A0220 | FOOT | PIPE CULVERTS, CLASS A, TYPE 1 15" | Base items | 68.000 | |||
542A0229 | FOOT | PIPE CULVERTS, CLASS A, TYPE 1 24" | Base items | 62.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
72000100 | SQ FT | SIGN PANEL - TYPE 1 | Base items | 35.000 | |||
72900100 | FOOT | METAL POST - TYPE A | Base items | 77.000 | |||
X0323013 | EACH | TUBULAR STEEL GATE | Base items | 1.000 | |||
X7010216 | L SUM | TRAFFIC CONTROL AND PROTECTION, (SPECIAL) | Base items | 1.000 | |||
Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
No More Pay Items |