024-64U53

Bulletin Description

0.5 miles of partial depth patching from Base St to 350' east of Milnes Dr in Morrison.
Region District DBE % VBP % Federal Project #
2 2 Pending Pending N/A
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Whiteside
  • FAP 309
  • US 30,IL 78
  • (17R)PP
  • C-92-076-25
  • 0-02180-2020
Contract Specifics
15 Working Days
Previously advertised on June 13, 2025 (Item 051).
No More Contract Specifics

Ask Subscribe Questions and Answers (0 Submitted / 0 Answered ) Questions not accepted as of July 22, 2025 04:30 PM.

Authorized Bidders

  • No authorized bidders

Non Bidders

  • No requests received
This list of pay items is subject to change until the Plans and Special Provisions have been published.
Pay Item # UOM Description Type Quantity Unit Price
40600295 POUND POLYMERIZED BITUMINOUS MATERIALS (TACK COAT) Base items 2,276.000
40600901 TON HOT-MIX ASPHALT BINDER COURSE (HAND METHOD), N70 Base items 50.000
40604062 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 Base items 811.000
44000165 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 4" Base items 4,877.000
44200050 SQ YD WELDED WIRE REINFORCEMENT Base items 32.000
44200994 SQ YD CLASS B PATCHES, TYPE II, 12 INCH Base items 32.000
44200998 SQ YD CLASS B PATCHES, TYPE III, 12 INCH Base items 32.000
44201299 EACH DOWEL BARS 1 1/2" Base items 120.000
44213200 FOOT SAW CUTS Base items 336.000
67100100 L SUM MOBILIZATION Base items 1.000
70100450 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701201 Base items 1.000
70102620 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 Base items 1.000
78009004 FOOT MODIFIED URETHANE PAVEMENT MARKING - LINE 4" Base items 2,470.000
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 22.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 22.000
No More Pay Items