| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 4 | 6 | 9.00 | 0.00 | 317SBGPTBD |
| County(s) | IL Project # | Airport | Sponsor | City |
|---|---|---|---|---|
|
TAZ 5080 | Taylorville Municipal | City of Taylorville | Taylorville |
| Contract Specifics |
|---|
| The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
| 113 Calendar Days |
|
WARNING: FAA Buy American Preference provisions apply to this contract. Failure to submit a “Certification of Compliance with FAA Buy American Preference – Construction Projects” form in accordance with the bidding procedures set forth in the proposal document (Appendix A4 BUY AMERICAN PREFERENCE) will result in the bid being declared non-responsive. |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| AR108158 | FOOT | 1/C #8 5 KV UG CABLE IN UD | Base items | 8,000.000 | |||
| AR108706 | FOOT | 1/C #6 COUNTERPOISE | Base items | 8,000.000 | |||
| AR108960 | FOOT | REMOVE CABLE | Base items | 7,100.000 | |||
| AR110014 | FOOT | 4" DIRECTIONAL BORE | Base items | 65.000 | |||
| AR110102 | EACH | DUCT MARKER - IN PAVEMENT | Base items | 6.000 | |||
| AR110551 | FOOT | EXTEND DUCT | Base items | 20.000 | |||
| AR110900 | FOOT | REMOVE DUCT | Base items | 50.000 | |||
| AR125411 | EACH | MITL-STAKE MOUNTED-LED | Base items | 47.000 | |||
| AR125416 | EACH | MITL-BASE MOUNTED-LED | Base items | 14.000 | |||
| AR125447 | EACH | TAXI GUIDANCE SIGN, 7 CHARACTER | Base items | 1.000 | |||
| AR125901 | EACH | REMOVE STAKE MOUNTED LIGHT | Base items | 48.000 | |||
| AR125902 | EACH | REMOVE BASE MOUNTED LIGHT | Base items | 26.000 | |||
| AR125904 | EACH | REMOVE TAXI GUIDANCE SIGN | Base items | 2.000 | |||
| AR125924 | EACH | REPLACE TAXI GUIDANCE SIGN | Base items | 1.000 | |||
| AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
| AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| AR152410 | CU YD | UNCLASSIFIED EXCAVATION | Base items | 1,200.000 | |||
| AR152480 | SQ YD | SHOULDER ADJUSTMENT | Base items | 15,400.000 | |||
| AR156520 | EACH | INLET PROTECTION | Base items | 7.000 | |||
| AR201660 | FOOT | BITUMINOUS CRACK REPAIR | Base items | 2,400.000 | |||
| AR201670 | SQ YD | CRACK CONTROL FABRIC | Base items | 1,100.000 | |||
| AR209612 | SQ YD | CRUSHED AGG. BASE COURSE - 12" | Base items | 1,100.000 | |||
| AR401610 | TON | BITUMINOUS SURFACE COURSE | Base items | 800.000 | |||
| AR401650 | SQ YD | BITUMINOUS PAVEMENT MILLING | Base items | 7,800.000 | |||
| AR401655 | SQ YD | BUTT JOINT CONSTRUCTION | Base items | 460.000 | |||
| AR401900 | SQ YD | REMOVE BITUMINOUS PAVEMENT | Base items | 7,300.000 | |||
| AR403610 | TON | BITUMINOUS BASE COURSE | Base items | 1,700.000 | |||
| AR602510 | GALLON | BITUMINOUS PRIME COAT | Base items | 310.000 | |||
| AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 1,600.000 | |||
| AR620520 | SQ FT | PAVEMENT MARKING-WATERBORNE | Base items | 9,600.000 | |||
| AR620525 | SQ FT | PAVEMENT MARKING-BLACK BORDER | Base items | 5,600.000 | |||
| AR620900 | SQ FT | PAVEMENT MARKING REMOVAL | Base items | 2,200.000 | |||
| AR705524 | FOOT | 4" PERFORATED UNDERDRAIN W/SOCK | Base items | 4,400.000 | |||
| AR705544 | FOOT | 4" NON PERFORATED UNDERDRAIN | Base items | 85.000 | |||
| AR705640 | EACH | UNDERDRAIN CLEANOUT | Base items | 10.000 | |||
| AR705645 | EACH | UNDERDRAIN CONNECTION | Base items | 5.000 | |||
| AR901510 | ACRE | SEEDING | Base items | 3.000 | |||
| AR904510 | SQ YD | SODDING | Base items | 2,000.000 | |||
| AR908514 | ACRE | LIGHT-DUTY HYDRAULIC MULCH | Base items | 3.000 | |||
| AS125924 | EACH | REPLACE TAXI GUIDANCE SIGN | Additive 1 | 2.000 | |||
| No More Pay Items | |||||||