20100110
|
UNIT
|
TREE REMOVAL (6 TO 15 UNITS DIAMETER)
|
Base items
|
62.000
|
|
20100210
|
UNIT
|
TREE REMOVAL (OVER 15 UNITS DIAMETER)
|
Base items
|
83.000
|
|
20101000
|
FOOT
|
TEMPORARY FENCE
|
Base items
|
547.000
|
|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
2,020.000
|
|
21301052
|
FOOT
|
EXPLORATION TRENCH 52" DEPTH
|
Base items
|
100.000
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
653.000
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
653.000
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
653.000
|
|
25000750
|
ACRE
|
MOWING
|
Base items
|
7.250
|
|
25100125
|
ACRE
|
MULCH, METHOD 3
|
Base items
|
5.250
|
|
25100630
|
SQ YD
|
EROSION CONTROL BLANKET
|
Base items
|
9,483.000
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
725.000
|
|
28000305
|
FOOT
|
TEMPORARY DITCH CHECKS
|
Base items
|
3,488.000
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
5,862.000
|
|
28000500
|
EACH
|
INLET AND PIPE PROTECTION
|
Base items
|
9.000
|
|
5421D024
|
FOOT
|
PIPE CULVERTS, CLASS D, TYPE 1 24" (TEMPORARY)
|
Base items
|
104.000
|
|
5422D048
|
FOOT
|
PIPE CULVERTS, CLASS D, TYPE 2 48" (TEMPORARY)
|
Base items
|
460.000
|
|
61133100
|
EACH
|
FIELD TILE JUNCTION VAULTS, 2' DIA.
|
Base items
|
1.000
|
|
61133200
|
EACH
|
FIELD TILE JUNCTION VAULTS, 3' DIA.
|
Base items
|
1.000
|
|
61133300
|
EACH
|
FIELD TILE JUNCTION VAULTS, 4' DIA.
|
Base items
|
1.000
|
|
61133400
|
EACH
|
FIELD TILE JUNCTION VAULTS, 5' DIA.
|
Base items
|
1.000
|
|
61139900
|
FOOT
|
STORM SEWERS (SPECIAL), 6"
|
Base items
|
100.000
|
|
61140000
|
FOOT
|
STORM SEWERS (SPECIAL), 8"
|
Base items
|
100.000
|
|
66900200
|
CU YD
|
NON-SPECIAL WASTE DISPOSAL
|
Base items
|
10.000
|
|
66900530
|
EACH
|
SOIL DISPOSAL ANALYSIS
|
Base items
|
1.000
|
|
66901001
|
L SUM
|
REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN
|
Base items
|
1.000
|
|
66901003
|
L SUM
|
REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT
|
Base items
|
1.000
|
|
66901006
|
CAL DA
|
REGULATED SUBSTANCES MONITORING
|
Base items
|
1.000
|
|
67000400
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A
|
Base items
|
8.000
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
70100450
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
|
Base items
|
1.000
|
|
70107025
|
CAL DA
|
CHANGEABLE MESSAGE SIGN
|
Base items
|
28.000
|
|
X0320050
|
L SUM
|
CONSTRUCTION LAYOUT (SPECIAL)
|
Base items
|
1.000
|
|
X2040805
|
CU YD
|
FURNISHED EXCAVATION (SPECIAL)
|
Base items
|
7,540.000
|
|
X2111100
|
CU YD
|
TOPSOIL EXCAVATION AND PLACEMENT (SPECIAL)
|
Base items
|
11,095.000
|
|
X2501845
|
ACRE
|
SEEDING, CLASS 7 (SPECIAL)
|
Base items
|
7.250
|
|
X7010216
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
|
Base items
|
1.000
|
|
Z0013797
|
SQ YD
|
STABILIZED CONSTRUCTION ENTRANCE
|
Base items
|
480.000
|
|