June 12, 2026 Letting 12:00 PM
084-68C93

Bulletin Description

Resurfacing IL 6 from north of IL 29 to IL 40 (Knoxville Ave) in Peoria in Peoria County. 2.94 miles gross length.
Region District DBE % VBP % Federal Project #
3 4 0.00 0.00 NHPP4TJZ(351)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Peoria
  • FAP 318
  • IL 6
  • 72[6RS;(6-1)RS-1]
  • C-94-006-16
  • 4-00112-0170
Contract Specifics
Project Labor Agreement
60 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (18 Submitted / 18 Answered ) Questions not accepted as of June 02, 2026 04:30 PM.

  • Sheet 33 shows for the guardrail to be anchored to the culvert. It is apart of the standard 63000001 pay item. How is this supposed to be anchored.
    The intentions for the guardrail locations on sheets 33 & 34 labeled “guardrail posts over culvert need to be anchored” was to include the pay item STRONG POST GUARDRAIL ATTACHED TO CULVERT. Please see attached Highway Standard and plan detail sheets for further information. It should be noted that plan quantities for Steel Plate Beam Guardrail, Type A include the lengths shown in the details which were not broken out at these locations. (06/05/2026)

  • How are the Concrete Barrier Wall Markers paid for?
    See Special Provision entitled “CONCRETE BARRIER WALL REMOVAL AND REPLACEMENT, LOCATION 1. (06/05/2026)

  • How is the removal and replacement of signs behind the Concrete Barrier Wall paid for?
    See Special Provision entitled “CONCRETE BARRIER WALL REMOVAL AND REPLACEMENT, LOCATION 1. (06/05/2026)

  • In the Bid Price Schedule the unit of measure for Item #31100200 is cu yd. In the Summary of Quantities the unit of measure is ton for item #31100100. Which is correct?
    The Pay item on page 4 in the Summary of Quantities should be 31100100 Subbase Granular Material, Type A, Tons. #31100100 is correct. (06/05/2026)

  • Could you verify the the Schedule for Pay Items 64300260 & X6370101 is correct?
    The schedule on sheet 20 of the plans has the locations switched for pay items 64300260 & X6370101. The proposed impact attenuator shall be placed at approximately the same location and offset as the existing located from Sta. 746+43 to 746+65 The intent is to remove the concrete barrier wall and existing attenuator then resurface the dead lane and shoulder. The existing concrete barrier wall shall be replaced at this location but the distance from left edge of pavement shall be increased, creating more of a shy line offset. This distance shall be approved by the Engineer. The schedule on sheet 20 includes the type of attenuator to be used. (06/05/2026)

  • Can you clarify the HMA Ramp Schedule on page 10 of the plan set. The area calculations for ramp B appear to be incorrect affecting all the quantities for ramp B and the ramp D mix quantities appear way overstated.
    Errors were discovered in the calculations for both ramps B and D in the schedule on page 16 (not page 10) and page 18 of the plan set. See revised schedules on pages 16 and 18 of the plan set. (06/05/2026)

  • For the barrier wall remove and replace, is the contract to remove/dispose of existing and provide new barrier wall? Or is the contractor relocating existing barrier wall, salvage, and re-install existing barrier wall?
    The contractor will remove/relocate existing barrier wall, salvage and re-install the existing barrier wall. A new attenuator is provided in the plans. The schedule on sheet 20 of the plans has the locations switched for pay items 64300260 & X6370101. The proposed impact attenuator shall be placed at approximately the same location and offset as the existing located from Sta. 746+43 to 746+65 The intent is to remove the concrete barrier wall and existing attenuator then resurface the dead lane and shoulder. The concrete barrier wall shall be replaced at this location but the distance from left edge of pavement shall be increased, creating more of a shy line offset. This distance shall be approved by the Engineer. The schedule on sheet 20 includes the type of attenuator to be used. See Special Revision entitled “CONCRETE BARRIER WALL REMOVAL AND REPLACEMENT, LOCATION 1 (06/05/2026)

  • Can you please clarify how the shoulders are to be paid for? There is a hot-mix asphalt shoulder pay item and there is a HMA surface course IL-9.5FG, mix"D", N50 item. The quantities do not match tables in the plans.
    The shoulders on mainline and ramps shall be paid as follows where applicable. Bottom lift, typical legend #11 – HOT-MIX ASPHALT SHOULDERS, 4.25” = pay item 35501301 in the summary of quantities. This is to be milled and placed prior to resurfacing, Lower lift, typical legend #12 – HOT-MIX ASPHALT SHOULDERS BINDER = pay item 48203100 in the summary of quantities. Surface lift, typical legend #13 – HOT-MIX ASPJHALT SHOULDERS SURFACE = pay item 40604010 in the summary of quantities. The Emergency cross over includes 48203100 & 40604010 along with HMA base course, 10” Item 35501301 will not be utilized when adjacent to ramp that will not be resurfaced. The quantity on page 4 in the Summary of Quantities should be corrected as follows: 35501301 Hot-Mix Asphalt Base Course, 4.25” should be 54,954 SQ YD. 40604010 Hot-Mix Asphalt Surface Course, IL-9.5 FG, Mix “D”, N50 should be 6,594 TONS In the Sequence of Operations this pay item 35501301 is referred as " 4.25" base course" (06/05/2026)

  • The quantity for HMA surface removal 4 1/4 is 54,954sy and for HMA base course 79,133sy. Where does the extra base course get placed?
    The quantity on page 4 in the Summary of Quantities for 35501301 Hot-Mix Asphalt Base Course, 4.25” should be 54,954 SQ YD. (06/05/2026)

  • The schedule of quanties on page18 of the plans has Subbase Gran Mat A in tons and the pay item is in CY. Please state which is correct.
    The Pay item on page 4 in the Summary of Quantities should be 31100100 Subbase Granular Material, Type A, Tons. (06/05/2026)

  • Is joint trimming required on the ramps? I do not see a quantity listed for it in the schedule and if so is there a sequence of operations for them?
    Yes, joint trimming is required on the ramps. The quantity was inadvertently left out of the schedule. A sequence of operations was not provided for the ramps and should be determined by the contractor and approved by the Engineer. The 4’ shoulder on ramps should be paved monolithically with mainline ramp pavement unless determined unfeasible. (06/05/2026)

  • On ramp D from station 18+14 to 25+17 the plans call for 3/4" milling and 3 3/4" HMA. The existing HMA is already in the curb pan and is flush with the crossover pavement in this area. Also station 29+24 to 49+00 the plans call for 4.25" milling and 8" HMA on shoulders with no pavement overlay. Please clarify what is wanted in these areas.
    From approximate stations 18+14 to 25+17 on ramp D the pavement elevation will need to remain unchanged. The typical section should show milling 3 ¾” and placing 3 ¾” of HMA. From approximate stations 29+24 to 49+00 on ramp D where there is no pavement overlay, the shoulders should be milled 3 ¾” and HMA SHOULDER (Lower and Surface lifts) should be placed at 1.75” & 2” respectfully. A quantity for HMA Surface Removal 3.75” has been added to the SOQ. (06/05/2026)

  • Can the drawings for the culvert, between stations 748 and 749 and where guardrail is to cross it, be made available. Additionally, please advise on how guardrail is supposed to be attached to culvert.
    The intentions for the guardrail locations on sheets 33 & 34 labeled “guardrail posts over culvert need to be anchored” was to include the pay item STRONG POST GUARDRAIL ATTACHED TO CULVERT. Please see attached Highway Standard and plan detail sheets for further information. It should be noted that plan quantities for Steel Plate Beam Guardrail, Type A include the lengths shown in the details which were not broken out at these locations. (06/05/2026)

  • 64300260 – Per the schedule of quantities, the impact attenuator is installed between STA 732+18 to 746+43. Please advise on the actual location of the attenuator and confirm the type of attenuator to be used.
    The schedule on sheet 20 of the plans has the locations switched for pay items 64300260 & X6370101. The proposed impact attenuator shall be placed at approximately the same location and offset as the existing located from Sta. 746+43 to 746+65 The intent is to remove the concrete barrier wall and existing attenuator then resurface the dead lane and shoulder. The existing concrete barrier wall shall be replaced at this location but the distance from left edge of pavement shall be increased, creating more of a shy line offset. This distance shall be approved by the Engineer. The schedule on sheet 20 includes the type of attenuator to be used. (06/05/2026)

  • X6320100 – Will a special provision for Guardrail Removal (Special) be provided?
    The pay item for Guardrail Removal should be 63200310 GUARDRAIL REMOVAL, not X6320100 GUARDRAIL REMOVAL (SPECIAL). The original intent was to use the special item and include removal of the erosion curb (board) and drainage structures. These items were subsequently broken out separately but the pay item wasn’t changed. (06/05/2026)

  • The work restriction special provision (SP) states that guardrail will need to be removed and reinstalled within 7 days, however the guardrail BDE SP is also included which states 3 days. Please confirm that the work restriction SP should take precedence over the BDE SP.
    Note #6 of the Working Restrictions & Traffic Control/Staging Notes special provision should be ignored and the BDE special provision entitled “GUARDRAIL” shall be followed. (06/05/2026)

  • On the Sequence of Operations sheet 40 of the plans, it states that guardrail installations shall be completed within the median during stage III. There is no median guardrail listed in the Guardrail Schedule or on plan sheets. Has some guardrail accidentally been omitted?
    There is no guardrail proposed to be installed in the median. (06/05/2026)

  • At Guardrail locations on sheets 33 & 34 of the plans, it states that GR Posts over culvert needs to be anchored. Typically there is a pay item for SPBGR Att To Culvert but there is no pay item or detail for attachment of posts in the plans. What is expected at these 2 locations?
    The intentions for the guardrail locations on sheets 33 & 34 labeled “guardrail posts over culvert need to be anchored” was to include the pay item STRONG POST GUARDRAIL ATTACHED TO CULVERT. Please see attached Highway Standard and plan detail sheets for further information. It should be noted that plan quantities for Steel Plate Beam Guardrail, Type A include the lengths shown in the details which were not broken out at these locations. (06/05/2026)

Authorized Bidders

  • 0049 Advanced Asphalt Company
    308 W Railroad Ave
    Princeton, IL 61356
    PO Box 234
    Princeton, IL 61356
    Phone: (815) 872-9911 Fax: (815) 872-0569 Email: estimating@advasphalt.biz
    $10,996,118.81

  • 1284 R. A. Cullinan and Son, a div of UCM, Inc.
    121 West Park Street
    Tremont, IL 61568
    P.O. Box 166
    Tremont, IL 61568
    Phone: (309) 925-2711 Fax: (309) 925-7131 Email: tom.wall@ucm.biz
    $11,150,809.34

Non Bidders

  • 5672 Stark Excavating, Inc.
    (Pending Authorization)
    1805 W Washington St.
    Bloomington, IL 61701
    Phone: (309) 828-5034 Fax: (309) 829-3897 Email: estimating@starkcompanies.com

Pay Item # UOM Description Type Quantity Unit Price
20200500 CU YD EARTH EXCAVATION (WIDENING) Base items 55.400
25000750 ACRE MOWING Base items 40.000
31100100 TON SUBBASE GRANULAR MATERIAL, TYPE A Base items 95.200
35501301 SQ YD HOT-MIX ASPHALT BASE COURSE, 4 1/4" Base items 54,954.000
35501324 SQ YD HOT-MIX ASPHALT BASE COURSE, 10" Base items 952.100
40600295 POUND POLYMERIZED BITUMINOUS MATERIALS (TACK COAT) Base items 208,905.000
40600405 TON MATERIAL TRANSFER DEVICE Base items 31,292.000
40600982 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT Base items 1,158.100
40600985 SQ YD PORTLAND CEMENT CONCRETE SURFACE REMOVAL - BUTT JOINT Base items 875.000
40600990 SQ YD TEMPORARY RAMP Base items 1,344.400
40603208 TON POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-9.5, N70 Base items 8,927.000
40604010 TON HOT-MIX ASPHALT SURFACE COURSE, IL-9.5FG, MIX "D", N50 Base items 6,594.000
40605034 TON POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, STONE MATRIX ASPHALT, 12.5, MIX "E", N80 Base items 10,202.000
40800050 TON INCIDENTAL HOT-MIX ASPHALT SURFACING Base items 142.400
44000152 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 3/4" Base items 1,577.000
44000164 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 3 3/4" Base items 3,518.300
44000166 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL, 4 1/4" Base items 52,685.000
44004250 SQ YD PAVED SHOULDER REMOVAL Base items 785.500
44200553 SQ YD CLASS A PATCHES, TYPE II, 10 INCH Base items 88.000
44200557 SQ YD CLASS A PATCHES, TYPE III, 10 INCH Base items 80.000
44200559 SQ YD CLASS A PATCHES, TYPE IV, 10 INCH Base items 3,096.900
44200583 SQ YD CLASS A PATCHES, TYPE IV, 12 INCH Base items 186.670
44213000 SQ YD PATCHING REINFORCEMENT Base items 4,478.100
44213200 FOOT SAW CUTS Base items 5,735.600
44213204 EACH TIE BARS 3/4" Base items 1,638.000
48101200 TON AGGREGATE SHOULDERS, TYPE B Base items 1,706.000
48203100 TON HOT-MIX ASPHALT SHOULDERS Base items 5,769.000
50300225 CU YD CONCRETE STRUCTURES Base items 14.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 1,110.000
63000001 FOOT STEEL PLATE BEAM GUARDRAIL, TYPE A, 6 FOOT POSTS Base items 11,925.000
63000030 FOOT STRONG POST GUARDRAIL ATTACHED TO CULVERT Base items 68.750
63100045 EACH TRAFFIC BARRIER TERMINAL, TYPE 2 Base items 13.000
63100085 EACH TRAFFIC BARRIER TERMINAL, TYPE 6 Base items 2.000
63100167 EACH TRAFFIC BARRIER TERMINAL, TYPE 1 (SPECIAL) TANGENT Base items 13.000
63200310 FOOT GUARDRAIL REMOVAL Base items 12,360.000
64200108 FOOT SHOULDER RUMBLE STRIPS, 8 INCH Base items 51,331.000
64300260 EACH IMPACT ATTENUATORS (FULLY REDIRECTIVE, NARROW), TEST LEVEL 3 Base items 1.000
67100100 L SUM MOBILIZATION Base items 1.000
70107025 CAL DA CHANGEABLE MESSAGE SIGN Base items 720.000
70300100 FOOT SHORT TERM PAVEMENT MARKING Base items 5,415.000
70300150 SQ FT SHORT TERM PAVEMENT MARKING REMOVAL Base items 1,805.000
70300241 FOOT TEMPORARY PAVEMENT MARKING - LINE 6"- PAINT Base items 73,845.000
70300251 FOOT TEMPORARY PAVEMENT MARKING - LINE 8"- PAINT Base items 549.240
72501000 EACH TERMINAL MARKER - DIRECT APPLIED Base items 28.000
78004630 FOOT PREFORMED PLASTIC PAVEMENT MARKING, TYPE D - STANDARD - LINE 6" Base items 73,845.000
78004640 FOOT PREFORMED PLASTIC PAVEMENT MARKING, TYPE D - STANDARD - LINE 8" Base items 549.240
78011035 FOOT GROOVING FOR RECESSED PAVEMENT MARKING 7" Base items 73,845.000
78011045 FOOT GROOVING FOR RECESSED PAVEMENT MARKING 9" Base items 549.240
78100100 EACH RAISED REFLECTIVE PAVEMENT MARKER Base items 323.000
78300200 EACH RAISED REFLECTIVE PAVEMENT MARKER REMOVAL Base items 323.000
X2600002 EACH RECOVERABLE DELINEATORS Base items 233.000
X4400196 SQ YD HOT-MIX ASPHALT SURFACE REMOVAL (SPECIAL) Base items 7,411.000
X4420559 SQ YD CLASS A PATCHES, TYPE IV, 10 INCH (SPECIAL) Base items 1,026.500
X6350204 EACH LINEAR DELINEATOR PANELS, 4 INCH Base items 156.000
X6370101 L SUM CONCRETE BARRIER WALL REMOVAL AND REPLACEMENT, LOCATION 1 Base items 1.000
X7010216 L SUM TRAFFIC CONTROL AND PROTECTION, (SPECIAL) Base items 1.000
XZ013798 L SUM CONSTRUCTION STATION LAYOUT Base items 1.000
Z0001002 TON GUARDRAIL AGGREGATE EROSION CONTROL Base items 2,418.000
Z0018700 EACH DRAINAGE STRUCTURE TO BE REMOVED Base items 14.000
Z0020805 FOOT EROSION CONTROL CURB REMOVAL Base items 7,168.700
Z0076600 HOUR TRAINEES Base items 5,000.000 $0.80
Z0076604 HOUR TRAINEES TRAINING PROGRAM GRADUATE Base items 5,000.000 $15.00
No More Pay Items