20101000
|
FOOT
|
TEMPORARY FENCE
|
Base items
|
673.000
|
|
|
20101300
|
EACH
|
TREE PRUNING (1 TO 10 INCH DIAMETER)
|
Base items
|
5.000
|
|
|
20101350
|
EACH
|
TREE PRUNING (OVER 10 INCH DIAMETER)
|
Base items
|
5.000
|
|
|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
760.000
|
|
|
20201200
|
CU YD
|
REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL
|
Base items
|
106.000
|
|
|
20700220
|
CU YD
|
POROUS GRANULAR EMBANKMENT
|
Base items
|
107.000
|
|
|
21001000
|
SQ YD
|
GEOTECHNICAL FABRIC FOR GROUND STABILIZATION
|
Base items
|
83.000
|
|
|
21101505
|
CU YD
|
TOPSOIL EXCAVATION AND PLACEMENT
|
Base items
|
319.000
|
|
|
21101615
|
SQ YD
|
TOPSOIL FURNISH AND PLACE, 4"
|
Base items
|
1,204.000
|
|
|
21400100
|
FOOT
|
GRADING AND SHAPING DITCHES
|
Base items
|
505.000
|
|
|
25000210
|
ACRE
|
SEEDING, CLASS 2A
|
Base items
|
0.750
|
|
|
25000314
|
ACRE
|
SEEDING, CLASS 4B
|
Base items
|
0.250
|
|
|
25000400
|
POUND
|
NITROGEN FERTILIZER NUTRIENT
|
Base items
|
70.000
|
|
|
25000500
|
POUND
|
PHOSPHORUS FERTILIZER NUTRIENT
|
Base items
|
70.000
|
|
|
25000600
|
POUND
|
POTASSIUM FERTILIZER NUTRIENT
|
Base items
|
70.000
|
|
|
25000750
|
ACRE
|
MOWING
|
Base items
|
0.750
|
|
|
25100115
|
ACRE
|
MULCH, METHOD 2
|
Base items
|
1.000
|
|
|
25100630
|
SQ YD
|
EROSION CONTROL BLANKET
|
Base items
|
3,722.000
|
|
|
25200110
|
SQ YD
|
SODDING, SALT TOLERANT
|
Base items
|
76.000
|
|
|
28000250
|
POUND
|
TEMPORARY EROSION CONTROL SEEDING
|
Base items
|
80.000
|
|
|
28000305
|
FOOT
|
TEMPORARY DITCH CHECKS
|
Base items
|
21.000
|
|
|
28000400
|
FOOT
|
PERIMETER EROSION BARRIER
|
Base items
|
1,067.000
|
|
|
28000500
|
EACH
|
INLET AND PIPE PROTECTION
|
Base items
|
2.000
|
|
|
28001100
|
SQ YD
|
TEMPORARY EROSION CONTROL BLANKET
|
Base items
|
3,785.000
|
|
|
30300001
|
CU YD
|
AGGREGATE SUBGRADE IMPROVEMENT
|
Base items
|
28.000
|
|
|
30300112
|
SQ YD
|
AGGREGATE SUBGRADE IMPROVEMENT 12"
|
Base items
|
412.000
|
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
264.000
|
|
|
40600370
|
FOOT
|
LONGITUDINAL JOINT SEALANT
|
Base items
|
240.000
|
|
|
40604062
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70
|
Base items
|
22.000
|
|
|
40605026
|
TON
|
POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, STONE MATRIX ASPHALT, 9.5, MIX "F", N80
|
Base items
|
78.000
|
|
|
42001300
|
SQ YD
|
PROTECTIVE COAT
|
Base items
|
59.000
|
|
|
44000157
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2"
|
Base items
|
193.000
|
|
|
44000500
|
FOOT
|
COMBINATION CURB AND GUTTER REMOVAL
|
Base items
|
76.000
|
|
|
44001980
|
FOOT
|
CONCRETE BARRIER REMOVAL
|
Base items
|
38.000
|
|
|
44201449
|
SQ YD
|
CLASS C PATCHES, TYPE IV, 18 INCH
|
Base items
|
371.000
|
|
|
50102400
|
CU YD
|
CONCRETE REMOVAL
|
Base items
|
1.100
|
|
|
50200100
|
CU YD
|
STRUCTURE EXCAVATION
|
Base items
|
351.000
|
|
|
50200450
|
CU YD
|
REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL FOR STRUCTURES
|
Base items
|
42.000
|
|
|
50800205
|
POUND
|
REINFORCEMENT BARS, EPOXY COATED
|
Base items
|
880.000
|
|
|
52200020
|
SQ FT
|
TEMPORARY SOIL RETENTION SYSTEM
|
Base items
|
620.000
|
|
|
54003000
|
CU YD
|
CONCRETE BOX CULVERTS
|
Base items
|
6.100
|
|
|
54010503
|
FOOT
|
PRECAST CONCRETE BOX CULVERTS 5' X 3'
|
Base items
|
130.000
|
|
|
54213657
|
EACH
|
PRECAST REINFORCED CONCRETE FLARED END SECTIONS 12"
|
Base items
|
2.000
|
|
|
542D1057
|
FOOT
|
PIPE CULVERTS, CLASS D, TYPE 2 12"
|
Base items
|
40.000
|
|
|
60605000
|
FOOT
|
COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24
|
Base items
|
76.000
|
|
|
60920024
|
FOOT
|
PIPE CULVERTS TO BE CLEANED 24"
|
Base items
|
62.000
|
|
|
63700280
|
FOOT
|
CONCRETE BARRIER, DOUBLE FACE, 44 INCH HEIGHT
|
Base items
|
38.000
|
|
|
63700900
|
FOOT
|
CONCRETE BARRIER BASE
|
Base items
|
38.000
|
|
|
64200116
|
FOOT
|
SHOULDER RUMBLE STRIPS, 16 INCH
|
Base items
|
2,475.000
|
|
|
66900200
|
CU YD
|
NON-SPECIAL WASTE DISPOSAL
|
Base items
|
500.000
|
|
|
66900530
|
EACH
|
SOIL DISPOSAL ANALYSIS
|
Base items
|
2.000
|
|
|
66901001
|
L SUM
|
REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN
|
Base items
|
1.000
|
|
|
66901003
|
L SUM
|
REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT
|
Base items
|
1.000
|
|
|
66901006
|
CAL DA
|
REGULATED SUBSTANCES MONITORING
|
Base items
|
15.000
|
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
|
70107025
|
CAL DA
|
CHANGEABLE MESSAGE SIGN
|
Base items
|
242.000
|
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
3,520.000
|
|
|
70307120
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 4" - TYPE IV TAPE
|
Base items
|
14,079.000
|
|
|
70400100
|
FOOT
|
TEMPORARY CONCRETE BARRIER
|
Base items
|
637.500
|
|
|
70400200
|
FOOT
|
RELOCATE TEMPORARY CONCRETE BARRIER
|
Base items
|
1,037.500
|
|
|
70600250
|
EACH
|
IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE), TEST LEVEL 3
|
Base items
|
2.000
|
|
|
70600350
|
EACH
|
IMPACT ATTENUATORS, RELOCATE (NON- REDIRECTIVE), TEST LEVEL 3
|
Base items
|
2.000
|
|
|
78000200
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 4"
|
Base items
|
8,723.000
|
|
|
78000600
|
FOOT
|
THERMOPLASTIC PAVEMENT MARKING - LINE 12"
|
Base items
|
124.000
|
|
|
78004630
|
FOOT
|
PREFORMED PLASTIC PAVEMENT MARKING, TYPE D - STANDARD - LINE 6"
|
Base items
|
1,090.000
|
|
|
78011035
|
FOOT
|
GROOVING FOR RECESSED PAVEMENT MARKING 7"
|
Base items
|
1,090.000
|
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
4.000
|
|
|
78200011
|
EACH
|
BARRIER WALL REFLECTORS, TYPE C
|
Base items
|
3.000
|
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
4.000
|
|
|
78300202
|
SQ FT
|
PAVEMENT MARKING REMOVAL - WATER BLASTING
|
Base items
|
2,454.000
|
|
|
B2000766
|
EACH
|
TREE, AMELANCHIER X GRANDIFLORA AUTUMN BRILLIANCE (AUTUMN BRILLIANCE SERVICE BERRY), 6' HEIGHT, SHRUB FORM, BALLED AND BURLAPPED
|
Base items
|
3.000
|
|
|
C2000436
|
EACH
|
SHRUB, ARONIA ARBUTIFOLIA BRILLIANT ISSIMA (BRILLANT RED CHOKEBERRY), 3' HEIGHT, BALLED AND BURLAPPED
|
Base items
|
95.000
|
|
|
C3006024
|
EACH
|
SHRUB, RHUS TYPHINA (STAGHORN SUMAC), 2' HEIGHT, BARE ROOT
|
Base items
|
25.000
|
|
|
K0036118
|
SQ YD
|
MULCH PLACEMENT 3"
|
Base items
|
482.000
|
|
|
X5420112
|
EACH
|
ELASTOMERIC CHECK VALVE 12" DIAMETER
|
Base items
|
1.000
|
|
|
X6061462
|
FOOT
|
CLEANING PAVED DITCH
|
Base items
|
147.000
|
|
|
X6420100
|
SQ YD
|
SHOULDER RUMBLE STRIP REMOVAL
|
Base items
|
826.000
|
|
|
X6700407
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A (D1)
|
Base items
|
4.000
|
|
|
X7010216
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, (SPECIAL)
|
Base items
|
1.000
|
|
|
X7010410
|
CAL MO
|
SPEED DISPLAY TRAILER
|
Base items
|
8.000
|
|
|
X7200061
|
SQ FT
|
TEMPORARY INFORMATION SIGNING
|
Base items
|
200.000
|
|
|
X7200062
|
EACH
|
TEMPORARY SIGNING
|
Base items
|
2.000
|
|
|
X7830050
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER, REFLECTOR REMOVAL
|
Base items
|
110.000
|
|
|
X7830052
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER, REFLECTOR REPLACEMENT
|
Base items
|
110.000
|
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
|
Z0054517
|
TON
|
ROCK FILL - FOUNDATION
|
Base items
|
57.000
|
|