| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 1 | 1 | 6.00 | 0.00 | N/A |
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
|---|---|---|---|---|---|
|
|
|
|
|
|
| Contract Specifics |
|---|
| 50 Working Days |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 20200100 | CU YD | EARTH EXCAVATION | Base items | 1,507.000 | |||
| 20201200 | CU YD | REMOVAL AND DISPOSAL OF UNSUITABLE MATERIAL | Base items | 74.000 | |||
| 21101615 | SQ YD | TOPSOIL FURNISH AND PLACE, 4" | Base items | 238.000 | |||
| 21400100 | FOOT | GRADING AND SHAPING DITCHES | Base items | 155.000 | |||
| 25000210 | ACRE | SEEDING, CLASS 2A | Base items | 0.030 | |||
| 25000400 | POUND | NITROGEN FERTILIZER NUTRIENT | Base items | 3.400 | |||
| 25000600 | POUND | POTASSIUM FERTILIZER NUTRIENT | Base items | 3.400 | |||
| 25100630 | SQ YD | EROSION CONTROL BLANKET | Base items | 238.000 | |||
| 25200200 | UNIT | SUPPLEMENTAL WATERING | Base items | 2.700 | |||
| 31101400 | SQ YD | SUBBASE GRANULAR MATERIAL, TYPE B 6" | Base items | 6,958.000 | |||
| 40600275 | POUND | BITUMINOUS MATERIALS (PRIME COAT) | Base items | 13,956.000 | |||
| 40600290 | POUND | BITUMINOUS MATERIALS (TACK COAT) | Base items | 1,396.000 | |||
| 40603085 | TON | HOT-MIX ASPHALT BINDER COURSE, IL-19.0, N70 | Base items | 1,063.000 | |||
| 40604062 | TON | HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N70 | Base items | 527.000 | |||
| 42000060 | SQ YD | WELDED WIRE REINFORCEMENT | Base items | 837.000 | |||
| 42000300 | SQ YD | PORTLAND CEMENT CONCRETE PAVEMENT 8" | Base items | 837.000 | |||
| 42001300 | SQ YD | PROTECTIVE COAT | Base items | 1,023.000 | |||
| 44000100 | SQ YD | PAVEMENT REMOVAL | Base items | 6,726.000 | |||
| 44000300 | FOOT | CURB REMOVAL | Base items | 445.000 | |||
| 44213204 | EACH | TIE BARS 3/4" | Base items | 30.000 | |||
| 48102100 | TON | AGGREGATE WEDGE SHOULDER, TYPE B | Base items | 0.800 | |||
| 55100500 | FOOT | STORM SEWER REMOVAL 12" | Base items | 45.000 | |||
| 60500050 | EACH | REMOVING CATCH BASINS | Base items | 1.000 | |||
| 60600095 | CU YD | CLASS SI CONCRETE (OUTLET) | Base items | 5.000 | |||
| 60605000 | FOOT | COMBINATION CONCRETE CURB AND GUTTER, TYPE B-6.24 | Base items | 445.000 | |||
| 60615400 | FOOT | PAVED DITCH, TYPE A-15 | Base items | 45.000 | |||
| 60920015 | FOOT | PIPE CULVERTS TO BE CLEANED 15" | Base items | 40.000 | |||
| 66900200 | CU YD | NON-SPECIAL WASTE DISPOSAL | Base items | 600.000 | |||
| 66900530 | EACH | SOIL DISPOSAL ANALYSIS | Base items | 4.000 | |||
| 66901001 | L SUM | REGULATED SUBSTANCES PRE-CONSTRUCTION PLAN | Base items | 1.000 | |||
| 66901003 | L SUM | REGULATED SUBSTANCES FINAL CONSTRUCTION REPORT | Base items | 1.000 | |||
| 66901006 | CAL DA | REGULATED SUBSTANCES MONITORING | Base items | 10.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70102620 | L SUM | TRAFFIC CONTROL AND PROTECTION, STANDARD 701501 | Base items | 1.000 | |||
| 78000200 | FOOT | THERMOPLASTIC PAVEMENT MARKING - LINE 4" | Base items | 144.000 | |||
| X2020110 | UNIT | GRADING AND SHAPING SHOULDERS | Base items | 0.600 | |||
| X6026050 | EACH | SANITARY MANHOLES TO BE ADJUSTED | Base items | 2.000 | |||
| X6700407 | CAL MO | ENGINEER'S FIELD OFFICE, TYPE A (D1) | Base items | 6.000 | |||
| Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
| No More Pay Items | |||||||