| Region | District | DBE % | VBP % | Federal Project # | 
|---|---|---|---|---|
| 2 | 3 | 3.00 | 0.00 | N/A | 
| County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) | 
|---|---|---|---|---|---|
| 
 | 
 |  | 
 | 
 | 
 | 
| Contract Specifics | 
|---|
| 35 Working Days | 
| No More Contract Specifics | 
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| 44000155 | SQ YD | HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2" | Base items | 27.000 | |||
| 50102400 | CU YD | CONCRETE REMOVAL | Base items | 16.000 | |||
| 50104000 | FOOT | BRIDGE RAIL REMOVAL | Base items | 38.000 | |||
| 50300255 | CU YD | CONCRETE SUPERSTRUCTURE | Base items | 16.000 | |||
| 50300300 | SQ YD | PROTECTIVE COAT | Base items | 50.000 | |||
| 50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 4,700.000 | |||
| 50800515 | EACH | BAR SPLICERS | Base items | 24.000 | |||
| 50800530 | EACH | MECHANICAL SPLICERS | Base items | 202.000 | |||
| 50901750 | FOOT | PARAPET RAILING | Base items | 38.000 | |||
| 52000110 | FOOT | PREFORMED JOINT STRIP SEAL | Base items | 82.000 | |||
| 67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| 70100207 | EACH | TRAFFIC CONTROL AND PROTECTION, STANDARD 701402 | Base items | 2.000 | |||
| 70107025 | CAL DA | CHANGEABLE MESSAGE SIGN | Base items | 14.000 | |||
| 70300100 | FOOT | SHORT TERM PAVEMENT MARKING | Base items | 370.000 | |||
| 70300150 | SQ FT | SHORT TERM PAVEMENT MARKING REMOVAL | Base items | 122.000 | |||
| 70400100 | FOOT | TEMPORARY CONCRETE BARRIER | Base items | 700.000 | |||
| 70400200 | FOOT | RELOCATE TEMPORARY CONCRETE BARRIER | Base items | 700.000 | |||
| 70600250 | EACH | IMPACT ATTENUATORS, TEMPORARY (NON- REDIRECTIVE), TEST LEVEL 3 | Base items | 2.000 | |||
| 70600350 | EACH | IMPACT ATTENUATORS, RELOCATE (NON- REDIRECTIVE), TEST LEVEL 3 | Base items | 2.000 | |||
| 78009004 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 4" | Base items | 1,920.000 | |||
| 78009006 | FOOT | MODIFIED URETHANE PAVEMENT MARKING - LINE 6" | Base items | 920.000 | |||
| X0323078 | FOOT | REMOVE AND RE-ERECT EXISTING BRIDGE RAIL | Base items | 60.000 | |||
| X0325748 | SQ YD | ACRYLIC COATING | Base items | 240.000 | |||
| X0325749 | SQ FT | FIBER WRAP | Base items | 168.000 | |||
| X0325969 | CAL DA | PORTABLE, VEHICLE MOUNTED, CHANGEABLE MESSAGE BOARD | Base items | 35.000 | |||
| X0326880 | HOUR | MESSAGE BOARD VEHICLE DRIVER | Base items | 280.000 | |||
| X0327980 | SQ FT | PAVEMENT MARKING REMOVAL - WATER BLASTING | Base items | 1,100.000 | |||
| X0970001 | CAL DA | WORK ZONE SPEED LIMIT SIGN ASSEMBLY | Base items | 50.000 | |||
| X2700001 | EACH | TEMPORARY RUMBLE STRIPS (SPECIAL) | Base items | 24.000 | |||
| X5080525 | EACH | BAR SPLICERS (SPECIAL) | Base items | 10.000 | |||
| Z0012754 | SQ FT | STRUCTURAL REPAIR OF CONCRETE (DEPTH EQUAL TO OR LESS THAN 5 INCHES) | Base items | 14.000 | |||
| Z0016200 | SQ YD | DECK SLAB REPAIR (PARTIAL) | Base items | 34.000 | |||
| Z0041895 | CU FT | POLYMER CONCRETE | Base items | 20.000 | |||
| Z0043800 | SQ FT | PRECAST PRESTRESSED CONCRETE I-BEAM REPAIR | Base items | 96.000 | |||
| No More Pay Items | |||||||