September 18, 2026 Letting 12:00 PM
065-72D17

Plans and Special Provisions are not available at this time

Bulletin Description

1 mile of roadway reconstruction on 6th Street from the I-55/I-72 interchange to Stevenson Drive.
Region District DBE % VBP % Federal Project #
4 6 Pending Pending NHPPS5PT(458)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Sangamon
  • VARIOUS
  • VARIOUS
  • (110X-5) WRS, N, SW
  • C-96-121-10
  • 6-00240-0000
  • 6-00240-0200
Contract Specifics
No More Contract Specifics

Ask Subscribe Questions and Answers (10 Submitted / 9 Answered ) Questions not accepted as of September 08, 2026 04:30 PM.

  • Can the as-built drawings be made available for the storm sewer removal?
    This information is not available. (09/10/2026)

  • Please clarify the details for traffic control for Stage 2 St. Joseph Street.
    The contractor should bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. (09/10/2026)

  • Do you have a detail or special provision relating to the bid item for Special Grate No. 1?
    Information pertaining to the Special Grate No. 1 can be found in the Manhole (Special) special provision. (09/09/2026)

  • How is the temporary pavement to be removed getting paid for? Is this incidental to the contract?
    That is covered under the 44000100 PAVEMENT REMOVAL pay item. See the staging and maintenance of traffic schedule on sheets #56-59. (09/08/2026)

  • Can you provide a schedule for the tree planting ? Sheets 449 & 450 show 34 of the 518 trees in the bid. Is there any idea where the rest of them get planted?
    The contractor should bid according to the Standard Specifications for Road and Bridge Construction, Highway Standards, and the plans and specifications available online. Please refer to the special provision, Trees. (09/08/2026)

  • Plan Sheets 154 and 155 depict Sections A-A to I-I for the Pre-stage work which are not detailed in the plans. Please clarify.
    Please disregard Sections A-A to I-I shown on the Overall Staging Plan - Pre-Stage A sheets 154 and 155. They were inadvertently displayed and not necessary for the construction of Pre-Stage A work items. (09/02/2026)

  • The project specification for Z0062456 Temporary Pavement indicates overall thickness should be shown in the mixture requirements table. I do not see it listed in the table.
    An addendum will be issued to address this question. Please continue to monitor the website for an update. (09/02/2026)

  • Is the message boards shown on the RTTCS to be paid for under the changeable message sign calendar day pay item, or the RTTCS system. The special provisions show that is included in each of these associated pay items.
    The message boards shown on the RTTCS are to be paid for according to the Changeable Message Sign special provision (Calendar Day). (09/01/2026)

  • Please post soil boring if available for this project.
    This information will be made available. Please continue to monitor the website for an update. (08/31/2026)

Authorized Bidders

  • 0338 Baxmeyer Construction, Inc.
    1034 Floraville Road
    Waterloo, IL 62298
    Phone: (618) 939-3000 Fax: (618) 939-4299 Email: estimator@baxmeyerconstruction.com

  • 2825 Illinois Valley Paving, a div of UCM, Inc.
    3151 Robbins Road
    Springfield, IL 62704
    P.O. Box 13420
    Springfield, IL 62791
    Phone: (217) 546-6192 Fax: (217) 546-1904 Email: IVP@ucm.biz

  • 3163 Kinney Contractors, Inc.
    19342 E. Frontage Rd.
    Raymond, IL 62560
    Phone: (217) 229-3322 Fax: (217) 229-3609 Email: kinney@roadbuilder.net

  • 3566 M.Q. Sewer Water Contractors, Inc. d/b/a M. Q. Construction Company
    4323 N. Central Ave.
    Chicago, IL 60634
    Phone: (773) 545-4749 Fax: (773) 545-6528 Email: No Record

  • 4991 Rees Construction Company of Quincy
    330 S. 5th St
    QUINCY, IL 62301
    P.O. Box 646
    Quincy, IL 62306
    Phone: (217) 222-0748 Fax: No Record Email: info@reesconstructionco.com

  • 5310 Sangamo Construction Company
    2100 East Moffat St
    Springfield, IL 62702
    Phone: (217) 544-9871 Fax: (217) 544-9873 Email: office@sangamo.net

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
No More Pay Items