20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
21.000
|
|
|
25000750
|
ACRE
|
MOWING
|
Base items
|
32.000
|
|
|
40200100
|
TON
|
AGGREGATE SURFACE COURSE, TYPE A
|
Base items
|
66.000
|
|
|
40600295
|
POUND
|
POLYMERIZED BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
220,459.000
|
|
|
40600405
|
TON
|
MATERIAL TRANSFER DEVICE
|
Base items
|
22,801.000
|
|
|
40600982
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
|
Base items
|
2,715.000
|
|
|
40600990
|
SQ YD
|
TEMPORARY RAMP
|
Base items
|
488.000
|
|
|
40602965
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N50
|
Base items
|
4,029.000
|
|
|
40603215
|
TON
|
POLYMERIZED HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N50
|
Base items
|
4,487.000
|
|
|
40604160
|
TON
|
POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "D", N50
|
Base items
|
14,286.000
|
|
|
40800050
|
TON
|
INCIDENTAL HOT-MIX ASPHALT SURFACING
|
Base items
|
374.000
|
|
|
42300400
|
SQ YD
|
PORTLAND CEMENT CONCRETE DRIVEWAY PAVEMENT, 8 INCH
|
Base items
|
257.000
|
|
|
44000200
|
SQ YD
|
DRIVEWAY PAVEMENT REMOVAL
|
Base items
|
257.000
|
|
|
48102100
|
TON
|
AGGREGATE WEDGE SHOULDER, TYPE B
|
Base items
|
2,848.000
|
|
|
48203100
|
TON
|
HOT-MIX ASPHALT SHOULDERS
|
Base items
|
11,113.000
|
|
|
64200108
|
FOOT
|
SHOULDER RUMBLE STRIPS, 8 INCH
|
Base items
|
91,237.000
|
|
|
64200214
|
FOOT
|
SINUSOIDAL RUMBLE STRIPS, 14"
|
Base items
|
45,679.000
|
|
|
67000400
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A
|
Base items
|
6.000
|
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
|
70100450
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
|
Base items
|
1.000
|
|
|
70100460
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701306
|
Base items
|
1.000
|
|
|
70107025
|
CAL DA
|
CHANGEABLE MESSAGE SIGN
|
Base items
|
14.000
|
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
13,704.000
|
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
1,523.000
|
|
|
70300221
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 4"- PAINT
|
Base items
|
17,785.000
|
|
|
70300241
|
FOOT
|
TEMPORARY PAVEMENT MARKING - LINE 6"- PAINT
|
Base items
|
90,085.000
|
|
|
78009004
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 4"
|
Base items
|
17,785.000
|
|
|
78009006
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 6"
|
Base items
|
90,085.000
|
|
|
78011025
|
FOOT
|
GROOVING FOR RECESSED PAVEMENT MARKING 5"
|
Base items
|
17,785.000
|
|
|
78011035
|
FOOT
|
GROOVING FOR RECESSED PAVEMENT MARKING 7"
|
Base items
|
90,085.000
|
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
571.000
|
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
594.000
|
|
|
X2020060
|
UNIT
|
EXCAVATING AND GRADING EXISTING SHOULDER, (SPECIAL)
|
Base items
|
912.000
|
|
|
X4005500
|
TON
|
CIR FULL DEPTH RECLAMATION EMULSIFIED ASPHALT
|
Base items
|
816.000
|
|
|
X4060221
|
SQ YD
|
COLD IN-PLACE RECYCLING, 4.0"
|
Base items
|
121,362.000
|
|
|
X4400196
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL (SPECIAL)
|
Base items
|
2,571.000
|
|
|
X4401198
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, VARIABLE DEPTH
|
Base items
|
121,362.000
|
|
|
XZ013798
|
L SUM
|
CONSTRUCTION STATION LAYOUT
|
Base items
|
1.000
|
|
|
Z0013798
|
L SUM
|
CONSTRUCTION LAYOUT
|
Base items
|
1.000
|
|
|
Z0055600
|
SQ YD
|
RUMBLE STRIP
|
Base items
|
100.000
|
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
5,000.000
|
$0.80
|
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
5,000.000
|
$15.00
|