Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
2 | 2 | 4.00 | 0.00 | 317SBGP120/133 |
County(s) | IL Project # | Airport | Sponsor | City |
---|---|---|---|---|
|
FEP 4203 | Albertus | City of Freeport | Freeport |
Contract Specifics |
---|
The time limit to award this item has been changed from 45 days to 60 days after the scheduled letting. |
50 Calendar Days |
Previously advertised on June 15, 2018 (Item 05A). |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
AR108158 | FOOT | 1/C #8 5 KV UG CABLE IN UD | Base items | 4,590.000 | |||
AR108402 | L.F. | 1/C #2 600 V UG CABLE | Base items | 570.000 | |||
AR108658 | FOOT | 3/C #8 600 V UG CABLE IN UD | Base items | 1,110.000 | |||
AR109110 | L SUM | ERECT PREFABRICATED VAULT | Base items | 1.000 | |||
AR109331 | EACH | 15 KW REGULATOR, STYLE 1 | Base items | 2.000 | |||
AR109400 | L SUM | POWER DISTRIBUTION SYSTEM | Base items | 1.000 | |||
AR109610 | L SUM | L-854 PCAL SYSTEM | Base items | 1.000 | |||
AR109910 | L.S. | REMOVE ELECTRICAL TRANSCLOSURE | Base items | 1.000 | |||
AR109963 | EACH | RELOCATE REGULATOR | Base items | 2.000 | |||
AR110014 | FOOT | 4" DIRECTIONAL BORE | Base items | 525.000 | |||
AR110218 | L.F. | 2 1/2" STEEL DUCT, DIRECT BURY | Base items | 430.000 | |||
AR110508 | FOOT | 8-WAY CONCRETE ENCASED DUCT | Base items | 580.000 | |||
AR110610 | EACH | ELECTRICAL HANDHOLE | Base items | 3.000 | |||
AR110615 | EACH | ELECTRICAL HANDHOLE, HIGH VOLTAGE | Base items | 2.000 | |||
AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
AR152410 | CU YD | UNCLASSIFIED EXCAVATION | Base items | 55.000 | |||
AR156510 | FOOT | SILT FENCE | Base items | 260.000 | |||
AR156520 | EACH | INLET PROTECTION | Base items | 2.000 | |||
AR209608 | SQ YD | CRUSHED AGG. BASE COURSE - 8" | Base items | 230.000 | |||
AR401610 | TON | BITUMINOUS SURFACE COURSE | Base items | 30.000 | |||
AR401900 | SQ YD | REMOVE BITUMINOUS PAVEMENT | Base items | 120.000 | |||
AR501605 | SQ FT | 5" PCC SIDEWALK | Base items | 125.000 | |||
AR603510 | GALLON | BITUMINOUS TACK COAT | Base items | 20.000 | |||
AR800054 | L.F. | REMOVE AND REPLACE FENCE | Base items | 125.000 | |||
AR800056 | L SUM | VAULT FOUNDATION AND FLOOR | Base items | 1.000 | |||
AR800105 | L.F. | 1/C #4/0 600V UG CABLE | Base items | 1,700.000 | |||
AR800119 | L.F. | 2 1/2" DIRECTIONAL BORE | Base items | 70.000 | |||
AR800178 | FOOT | FIBER OPTIC CABLE | Base items | 1,340.000 | |||
AR800192 | L SUM | INSTALL ALCMS L-890 | Base items | 1.000 | |||
AR901510 | ACRE | SEEDING | Base items | 2.000 | |||
AR908510 | ACRE | MULCHING | Base items | 2.000 | |||
No More Pay Items |