Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
3 | 5 | 4.00 | 0.00 | M2NN(809) |
County(s) | Key Route(s) | Marked Route(s) | Section(s) | State Job #(s) | PPS #(s) |
---|---|---|---|---|---|
|
|
|
|
|
|
Contract Specifics |
---|
30 Working Days |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
20200100 | CU YD | EARTH EXCAVATION | Base items | 112.000 | |||
20300100 | CU YD | CHANNEL EXCAVATION | Base items | 167.000 | |||
25000200 | ACRE | SEEDING, CLASS 2 | Base items | 0.250 | |||
25000400 | POUND | NITROGEN FERTILIZER NUTRIENT | Base items | 23.000 | |||
25000500 | POUND | PHOSPHORUS FERTILIZER NUTRIENT | Base items | 23.000 | |||
25000600 | POUND | POTASSIUM FERTILIZER NUTRIENT | Base items | 23.000 | |||
25100115 | ACRE | MULCH, METHOD 2 | Base items | 0.250 | |||
28000250 | POUND | TEMPORARY EROSION CONTROL SEEDING | Base items | 25.000 | |||
28000305 | FOOT | TEMPORARY DITCH CHECKS | Base items | 48.000 | |||
28000400 | FOOT | PERIMETER EROSION BARRIER | Base items | 699.000 | |||
28100807 | TON | STONE DUMPED RIPRAP, CLASS A4 | Base items | 240.000 | |||
28200200 | SQ YD | FILTER FABRIC | Base items | 290.000 | |||
40200800 | TON | AGGREGATE SURFACE COURSE, TYPE B | Base items | 384.000 | |||
50100100 | EACH | REMOVAL OF EXISTING STRUCTURES | Base items | 1.000 | |||
50200100 | CU YD | STRUCTURE EXCAVATION | Base items | 133.000 | |||
50300225 | CU YD | CONCRETE STRUCTURES | Base items | 33.900 | |||
50400505 | SQ FT | PRECAST PRESTRESSED CONCRETE DECK BEAMS (27" DEPTH) | Base items | 1,718.000 | |||
50800205 | POUND | REINFORCEMENT BARS, EPOXY COATED | Base items | 3,940.000 | |||
50900205 | FOOT | STEEL RAILING, TYPE S1 | Base items | 128.000 | |||
51201600 | FOOT | FURNISHING STEEL PILES HP12X53 | Base items | 340.000 | |||
51202305 | FOOT | DRIVING PILES | Base items | 340.000 | |||
51203600 | EACH | TEST PILE STEEL HP12X53 | Base items | 2.000 | |||
51204650 | EACH | PILE SHOES | Base items | 12.000 | |||
51500100 | EACH | NAME PLATES | Base items | 1.000 | |||
59300100 | CU YD | CONTROLLED LOW-STRENGTH MATERIAL | Base items | 45.000 | |||
67100100 | L SUM | MOBILIZATION | Base items | 1.000 | |||
72501000 | EACH | TERMINAL MARKER - DIRECT APPLIED | Base items | 4.000 | |||
X7011830 | EACH | TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21 | Base items | 1.000 | |||
XX004566 | CU YD | CONCRETE CUT-OFF WALL | Base items | 7.900 | |||
Z0013798 | L SUM | CONSTRUCTION LAYOUT | Base items | 1.000 | |||
No More Pay Items |