|
20200100
|
CU YD
|
EARTH EXCAVATION
|
Base items
|
49.000
|
|
|
35800100
|
SQ YD
|
PREPARATION OF BASE
|
Base items
|
176.000
|
|
|
35800200
|
TON
|
AGGREGATE BASE REPAIR
|
Base items
|
59.000
|
|
|
40200800
|
TON
|
AGGREGATE SURFACE COURSE, TYPE B
|
Base items
|
16.000
|
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
25,438.000
|
|
|
40600370
|
FOOT
|
LONGITUDINAL JOINT SEALANT
|
Base items
|
13,694.000
|
|
|
40600982
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
|
Base items
|
638.000
|
|
|
40600990
|
SQ YD
|
TEMPORARY RAMP
|
Base items
|
83.000
|
|
|
40602965
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N50
|
Base items
|
2,355.000
|
|
|
40604150
|
TON
|
POLYMERIZED HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50
|
Base items
|
2,826.000
|
|
|
40800029
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
345.000
|
|
|
40800050
|
TON
|
INCIDENTAL HOT-MIX ASPHALT SURFACING
|
Base items
|
188.000
|
|
|
44000155
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2"
|
Base items
|
33,641.000
|
|
|
44000200
|
SQ YD
|
DRIVEWAY PAVEMENT REMOVAL
|
Base items
|
228.000
|
|
|
48102100
|
TON
|
AGGREGATE WEDGE SHOULDER, TYPE B
|
Base items
|
800.000
|
|
|
48203023
|
SQ YD
|
HOT-MIX ASPHALT SHOULDERS, 6 1/2"
|
Base items
|
11,904.000
|
|
|
48203100
|
TON
|
HOT-MIX ASPHALT SHOULDERS
|
Base items
|
1,019.000
|
|
|
64200108
|
FOOT
|
SHOULDER RUMBLE STRIPS, 8 INCH
|
Base items
|
26,729.000
|
|
|
67000400
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A
|
Base items
|
6.000
|
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
|
70100450
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
|
Base items
|
1.000
|
|
|
70100460
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701306
|
Base items
|
1.000
|
|
|
70100500
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701326
|
Base items
|
1.000
|
|
|
70107025
|
CAL DA
|
CHANGEABLE MESSAGE SIGN
|
Base items
|
15.000
|
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
4,112.000
|
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
1,371.000
|
|
|
78009000
|
SQ FT
|
MODIFIED URETHANE PAVEMENT MARKING - LETTERS AND SYMBOLS
|
Base items
|
122.000
|
|
|
78009005
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 5"
|
Base items
|
40,877.000
|
|
|
78009024
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 24"
|
Base items
|
94.000
|
|
|
78011000
|
SQ FT
|
GROOVING FOR RECESSED PAVEMENT MARKING, LETTERS AND SYMBOLS
|
Base items
|
122.000
|
|
|
78011030
|
FOOT
|
GROOVING FOR RECESSED PAVEMENT MARKING 6"
|
Base items
|
40,877.000
|
|
|
78011125
|
FOOT
|
GROOVING FOR RECESSED PAVEMENT MARKING 25"
|
Base items
|
94.000
|
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
509.000
|
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
509.000
|
|
|
X2020060
|
UNIT
|
EXCAVATING AND GRADING EXISTING SHOULDER, (SPECIAL)
|
Base items
|
267.000
|
|
|
X4021000
|
EACH
|
TEMPORARY ACCESS (PRIVATE ENTRANCE)
|
Base items
|
5.000
|
|
|
X4022000
|
EACH
|
TEMPORARY ACCESS (COMMERCIAL ENTRANCE)
|
Base items
|
3.000
|
|
|
Z0048665
|
L SUM
|
RAILROAD PROTECTIVE LIABILITY INSURANCE
|
Base items
|
1.000
|
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
1,000.000
|
$0.80
|
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
1,000.000
|
$15.00
|