|
35800100
|
SQ YD
|
PREPARATION OF BASE
|
Base items
|
717.000
|
|
|
40200800
|
TON
|
AGGREGATE SURFACE COURSE, TYPE B
|
Base items
|
80.000
|
|
|
40600290
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
58,344.000
|
|
|
40600370
|
FOOT
|
LONGITUDINAL JOINT SEALANT
|
Base items
|
30,758.000
|
|
|
40600405
|
TON
|
MATERIAL TRANSFER DEVICE
|
Base items
|
6,894.000
|
|
|
40600982
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL - BUTT JOINT
|
Base items
|
2,039.000
|
|
|
40602965
|
TON
|
HOT-MIX ASPHALT BINDER COURSE, IL-9.5FG, N50
|
Base items
|
5,745.000
|
|
|
40604050
|
TON
|
HOT-MIX ASPHALT SURFACE COURSE, IL-9.5, MIX "C", N50
|
Base items
|
6,894.000
|
|
|
40800029
|
POUND
|
BITUMINOUS MATERIALS (TACK COAT)
|
Base items
|
1,240.000
|
|
|
40800050
|
TON
|
INCIDENTAL HOT-MIX ASPHALT SURFACING
|
Base items
|
343.000
|
|
|
44000155
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 1 1/2"
|
Base items
|
79,874.000
|
|
|
44000160
|
SQ YD
|
HOT-MIX ASPHALT SURFACE REMOVAL, 2 3/4"
|
Base items
|
6,335.000
|
|
|
44200180
|
SQ YD
|
PAVEMENT PATCHING, TYPE II, 15 INCH
|
Base items
|
184.000
|
|
|
44200184
|
SQ YD
|
PAVEMENT PATCHING, TYPE III, 15 INCH
|
Base items
|
280.000
|
|
|
44200186
|
SQ YD
|
PAVEMENT PATCHING, TYPE IV, 15 INCH
|
Base items
|
709.000
|
|
|
48102100
|
TON
|
AGGREGATE WEDGE SHOULDER, TYPE B
|
Base items
|
1,551.000
|
|
|
48203100
|
TON
|
HOT-MIX ASPHALT SHOULDERS
|
Base items
|
664.000
|
|
|
64200108
|
FOOT
|
SHOULDER RUMBLE STRIPS, 8 INCH
|
Base items
|
11,856.000
|
|
|
67000400
|
CAL MO
|
ENGINEER'S FIELD OFFICE, TYPE A
|
Base items
|
6.000
|
|
|
67100100
|
L SUM
|
MOBILIZATION
|
Base items
|
1.000
|
|
|
70100450
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701201
|
Base items
|
1.000
|
|
|
70100460
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701306
|
Base items
|
1.000
|
|
|
70100600
|
L SUM
|
TRAFFIC CONTROL AND PROTECTION, STANDARD 701336
|
Base items
|
1.000
|
|
|
70107025
|
CAL DA
|
CHANGEABLE MESSAGE SIGN
|
Base items
|
15.000
|
|
|
70300100
|
FOOT
|
SHORT TERM PAVEMENT MARKING
|
Base items
|
10,518.000
|
|
|
70300150
|
SQ FT
|
SHORT TERM PAVEMENT MARKING REMOVAL
|
Base items
|
1,231.000
|
|
|
72001000
|
SQ FT
|
SIGN PANEL (STATE FURNISHED)
|
Base items
|
8.000
|
|
|
78009005
|
FOOT
|
MODIFIED URETHANE PAVEMENT MARKING - LINE 5"
|
Base items
|
86,000.000
|
|
|
78100100
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER
|
Base items
|
406.000
|
|
|
78300200
|
EACH
|
RAISED REFLECTIVE PAVEMENT MARKER REMOVAL
|
Base items
|
394.000
|
|
|
X4406812
|
SQ YD
|
PORTLAND CEMENT CONCRETE SURFACE REMOVAL 1 1/2"
|
Base items
|
224.000
|
|
|
Z0076600
|
HOUR
|
TRAINEES
|
Base items
|
2,000.000
|
$0.80
|
|
Z0076604
|
HOUR
|
TRAINEES TRAINING PROGRAM GRADUATE
|
Base items
|
2,000.000
|
$15.00
|