March 08, 2024 Letting 12:00 PM
153-91618

Bulletin Description

Replace the bridge carrying TR 243 over Stony Creek, 1.5 miles northwest of Muncie.
Region District DBE % VBP % Federal Project #
3 5 4.00 0.00 D196(056)
County(s) Key Route(s) Marked Route(s) Section(s) State Job #(s) PPS #(s)
  • Vermilion
  • TR 243
  • 1850 NORTH
  • 18-14144-00-BR
  • C-95-003-23
  • 5-10517-0000
Contract Specifics
55 Working Days
No More Contract Specifics

Ask Subscribe Questions and Answers (3 Submitted / 3 Answered ) Questions not accepted as of February 27, 2024 04:30 PM.

  • Do the stumps, including the root ball, have to be completely removed?
    Unless otherwise directed by the Engineer during construction, Article 201.04 of the Standard Specifications will take precedence for the removal limits, as referred to in the contract Special Provisions. (02/21/2024)

  • The bill of materials on plan sheet 15 include cofferdams at locations 1 & 2. No pay item exists in the summary of quantities. Will cofferdams be paid for?
    An addendum will be issued. (02/14/2024)

  • Can existing structure plans be made available?
    There are no existing structure plans. (02/07/2024)

Authorized Bidders

  • 5672 Stark Excavating, Inc.
    1805 W Washington St.
    Bloomington, IL 61701
    Phone: (309) 828-5034 Fax: (309) 829-3897 Email: estimating@starkcompanies.com
    $1,162,872.36

  • 5310 Sangamo Construction Company
    2100 East Moffat St
    Springfield, IL 62702
    Phone: (217) 544-9871 Fax: (217) 544-9873 Email: office@sangamo.net

  • 0958 William Charles Construction Company, LLC
    833 Featherstone Road
    Rockford, IL 61107
    P.O. Box 2071
    Loves Park, IL 61130
    Phone: (815) 654-4700 Fax: (815) 654-4736 Email: estimating@williamcharlesconstruction.com
    $1,236,000.00

Non Bidders

  • No requests received
Pay Item # UOM Description Type Quantity Unit Price
20200100 CU YD EARTH EXCAVATION Base items 464.000
20300100 CU YD CHANNEL EXCAVATION Base items 900.000
20400800 CU YD FURNISHED EXCAVATION Base items 895.000
25000200 ACRE SEEDING, CLASS 2 Base items 0.750
25000400 POUND NITROGEN FERTILIZER NUTRIENT Base items 55.000
25000500 POUND PHOSPHORUS FERTILIZER NUTRIENT Base items 55.000
25000600 POUND POTASSIUM FERTILIZER NUTRIENT Base items 55.000
25100115 ACRE MULCH, METHOD 2 Base items 0.750
28000250 POUND TEMPORARY EROSION CONTROL SEEDING Base items 181.000
28000305 FOOT TEMPORARY DITCH CHECKS Base items 120.000
28000500 EACH INLET AND PIPE PROTECTION Base items 3.000
35100100 TON AGGREGATE BASE COURSE, TYPE A Base items 545.000
40200800 TON AGGREGATE SURFACE COURSE, TYPE B Base items 367.000
50100100 EACH REMOVAL OF EXISTING STRUCTURES Base items 1.000
50105220 FOOT PIPE CULVERT REMOVAL Base items 32.000
50200100 CU YD STRUCTURE EXCAVATION Base items 141.000
50300225 CU YD CONCRETE STRUCTURES Base items 91.900
50400505 SQ FT PRECAST PRESTRESSED CONCRETE DECK BEAMS (27" DEPTH) Base items 4,856.000
50800205 POUND REINFORCEMENT BARS, EPOXY COATED Base items 9,020.000
50900205 FOOT STEEL RAILING, TYPE S1 Base items 364.000
51201400 FOOT FURNISHING STEEL PILES HP10X42 Base items 736.000
51202305 FOOT DRIVING PILES Base items 736.000
51203400 EACH TEST PILE STEEL HP10X42 Base items 4.000
51204650 EACH PILE SHOES Base items 28.000
51500100 EACH NAME PLATES Base items 1.000
54205053 FOOT PIPE CULVERTS, SPECIAL 18" Base items 115.000
59300100 CU YD CONTROLLED LOW-STRENGTH MATERIAL Base items 82.000
67100100 L SUM MOBILIZATION Base items 1.000
72501000 EACH TERMINAL MARKER - DIRECT APPLIED Base items 4.000
X2010400 UNIT STUMP REMOVAL ONLY Base items 180.000
X2810210 TON STONE RIPRAP, CLASS A5 (SPECIAL) Base items 522.000
XX004566 CU YD CONCRETE CUT-OFF WALL Base items 6.400
XX004633 EACH FIELD TILE ADJUSTMENT Base items 1.000
XX009289 L SUM TRAFFIC CONTROL AND PROTECTION, STANDARD BLR 21 Base items 1.000
Z0013798 L SUM CONSTRUCTION LAYOUT Base items 1.000
No More Pay Items