| Region | District | DBE % | VBP % | Federal Project # |
|---|---|---|---|---|
| 4 | 7 | 5.00 | 0.00 | N/A |
| County(s) | IL Project # | Airport | Sponsor | City |
|---|---|---|---|---|
|
FOA 4986 | Flora | Flora Airport Authority | Flora |
| Contract Specifics |
|---|
| The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
| 56 Calendar Days |
| Previously advertised on November 17, 2023 (Item 03A). |
| No More Contract Specifics |
| Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
|---|---|---|---|---|---|---|---|
| AR108962 | FOOT | REPLACE CABLE | Base items | 105.000 | |||
| AR110117 | FOOT | 1-1/2" PVC DUCT, DIRECT BURY | Base items | 100.000 | |||
| AR150510 | L SUM | ENGINEER'S FIELD OFFICE | Base items | 1.000 | |||
| AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
| AR209604 | SQ YD | CRUSHED AGG. BASE COURSE - 4" | Base items | 66.000 | |||
| AR401900 | SQ YD | REMOVE BITUMINOUS PAVEMENT | Base items | 1,760.000 | |||
| AR501506 | SQ YD | 6" PCC PAVEMENT | Base items | 27.000 | |||
| AR501605 | SQ FT | 5" PCC SIDEWALK | Base items | 349.000 | |||
| AR620520 | SQ FT | PAVEMENT MARKING-WATERBORNE | Base items | 532.000 | |||
| AR701900 | FOOT | REMOVE PIPE | Base items | 38.000 | |||
| AR705944 | EACH | ADJUST UNDERDRAIN CLEANOUT | Base items | 3.000 | |||
| AR751001 | FOOT | TRENCH DRAIN | Base items | 16.000 | |||
| AR760810 | EACH | WATER METER | Base items | 1.000 | |||
| AR800925 | FOOT | HDPE PIPE CULVERT | Base items | 50.000 | |||
| AR901510 | ACRE | SEEDING | Base items | 0.100 | |||
| AR905530 | SQ YD | TOPSOILING | Base items | 385.000 | |||
| AR908510 | ACRE | MULCHING | Base items | 0.100 | |||
| AR910230 | EACH | HANDICAP SIGN | Base items | 2.000 | |||
| AR910410 | EACH | PARKING BLOCK | Base items | 8.000 | |||
| AR910415 | EACH | REMOVE PARKING BLOCK | Base items | 7.000 | |||
| AR910420 | EACH | BOLLARD | Base items | 2.000 | |||
| AR910425 | EACH | REMOVE BOLLARD | Base items | 3.000 | |||
| AS152410 | CU YD | UNCLASSIFIED EXCAVATION | Alternate A | 756.000 | |||
| AS209608 | SQ YD | CRUSHED AGGREGATE BASE COURSE - 8" | Alternate A | 2,680.000 | |||
| AS401613 | TON | BIT. SURF. CSE.-METHOD I, SUPERPAVE | Alternate A | 325.000 | |||
| AS403613 | TON | BIT. BASE COURSE-METHOD I SUPERPAVE | Alternate A | 485.000 | |||
| AS602510 | GALLON | BITUMINOUS PRIME COAT | Alternate A | 805.000 | |||
| AS603510 | GALLON | BITUMINOUS TACK COAT | Alternate A | 270.000 | |||
| AT152410 | CU YD | UNCLASSIFIED EXCAVATION | Alternate B | 533.000 | |||
| AT209604 | SQ YD | CRUSHED AGGREGATE BASE COURSE-4" | Alternate B | 2,693.000 | |||
| AT501506 | SQ YD | 6" PCC PAVEMENT | Alternate B | 2,693.000 | |||
| No More Pay Items | |||||||