Region | District | DBE % | VBP % | Federal Project # |
---|---|---|---|---|
3 | 5 | 0.00 | 0.00 | N/A |
County(s) | IL Project # | Airport | Sponsor | City |
---|---|---|---|---|
|
PRG 4981 | Edgar County | County of Edgar | Paris |
Contract Specifics |
---|
The time limit to award this item has been changed from 45 days to 90 days after the scheduled letting. |
29 Calendar Days |
Previously advertised on September 22, 2023 (Item 06A). |
No More Contract Specifics |
Pay Item # | UOM | Description | Type | Quantity | Unit Price | ||
---|---|---|---|---|---|---|---|
AR108088 | FOOT | 1/C #8 XLP-USE | Base items | 2,000.000 | |||
AR108658 | FOOT | 3/C #8 600 V UG CABLE IN UD | Base items | 3,875.000 | |||
AR110014 | FOOT | 4" DIRECTIONAL BORE | Base items | 115.000 | |||
AR125620 | EACH | ABBREVIATED PAPI (L-881 SYSTEM) | Base items | 1.000 | |||
AR150520 | L SUM | MOBILIZATION | Base items | 1.000 | |||
AS108088 | FOOT | 1/C #8 XLP-USE | Additive 1 | 2,000.000 | |||
AS108658 | FOOT | 3/C #8 600V UG CABLE IN UD | Additive 1 | 1,125.000 | |||
AS110014 | FOOT | 4" DIRECTIONAL BORE | Additive 1 | 190.000 | |||
AS125620 | EACH | ABBREVIATED PAPI (L-881 SYSTEM) | Additive 1 | 1.000 | |||
AT125910 | EACH | REMOVE PLASI | Additive 2 | 1.000 | |||
AU125910 | EACH | REMOVE PLASI | Additive 3 | 1.000 | |||
No More Pay Items |